Acergy : seabed-to-surface
seabed-to-surface

Erha

Our ongoing SURF contract with ExxonMobil on the Erha Project sees the local fabrication of all piles with mooring systems, along with the installation of all subsea items such as flowlines and Steel Catenary Risers to hang off the FPSO. We are also responsible for the installation of Offshore Loading Lines (OLL), tying the FPSO to the offshore loading buoy. Several of our vessels have been involved. The u-shaped design of the OLL lines confirms this as the new industry standard following our successful pioneering work on Girassol using the Lazy W configuration.