Working as prime contractor to Total, this project calls for the fabrication of a jacket and topsides for a new water injection platform (AMD3). This will be built at our local Warri facility, then transported to the site and installed by us. The project also involves laying pipeline in various sizes up to 24” for the 60km long export line, with a landfall on Bonny Island. Many spools with be fabricated at Warri, together with related tie-ins. The project also involves some hook-up and commissioning, with several of our vessels heavily committed.