Jump To Content | Graphics

HOME | SITEMAP | FEEDBACK

ABOUT US | OUR CAPABILITIES | HSE | INVESTORS AND PRESS | CAREER ZONE | INFORMATION CENTRE | OUR WORLD | CONTACT US
WHO WE ARE | WHAT WE DO | WHERE WE OPERATE | OUR HISTORY | OUR VISION AND VALUES | OUR PEOPLE | MANAGEMENT TEAM | BOARD OF DIRECTORS | HOW WE'RE ORGANISED | CONDUCT AND ETHICS | CORPORATE GOVERNANCE | COMMUNITY AND SOCIETY

Dumbarton

Awarded in November 2005, Acergy was contracted to provide subsea installation services to Maersk Oil North Sea UK Limited for the development of the Dumbarton field in the UK Sector of the North Sea. Dumbarton is a redevelopment of the previously abandoned Donan Field.

Phase 1 of the development comprises 5 production and 1 water disposal wells tied back to the Global Producer III (GPIII), a floating production, storage and offloading (FPSO) vessel, and a 10.5 km 6-inch gas export flow line to the NSP MacCulloch FPSO. The Dumbarton drill centre being located some 2.2 km to the North East of the GPIII FPSO location.


Downloads


Links


^ BACK TO TOP

© Copyright 2008 | Legal notice