Jump To Content | Graphics

HOME | SITEMAP | FEEDBACK

ABOUT US | OUR CAPABILITIES | HSE | INVESTORS AND PRESS | CAREER ZONE | INFORMATION CENTRE | OUR WORLD | CONTACT US
WHO WE ARE | WHAT WE DO | WHERE WE OPERATE | OUR HISTORY | OUR VISION AND VALUES | OUR PEOPLE | MANAGEMENT TEAM | BOARD OF DIRECTORS | HOW WE'RE ORGANISED | CONDUCT AND ETHICS | CORPORATE GOVERNANCE | COMMUNITY AND SOCIETY

Tampen Link Hot Tap

Acergy was awarded the Tampen Link Hot Tap project in January 2006.

This project will comprise of detailed design, engineering, procurement, fabrication, installation and pre-commissioning of hot tap assembly incorporating 16" hot tap valve, piping unit and protection structure.

At the heart of the project lies Acergy’s proven hot tap design – a manually welded nipple enclosed by a mechanical reinforcing sleeve. Preheat for the hyperbaric welding is provided by Acergy’s patented induction heating system, designed specifically to handle the high heat transfer conditions encountered on a live major oil and gas trunk line. Tampen Link will be the sixth hot tap performed by Acergy in this way


Downloads


Links


^ BACK TO TOP

© Copyright 2008 | Legal notice